Fire Island Inlet to Montauk Point, NY Reformulation

General

    USACE District:New YorkCongressional Dist.:1,2,3
    Type:Shore Protection Project Length:83.0 miles
    State:NY
    Non-Structural:BEACH_NOURISHMENT
    Structural:unknown
    Ecosystem Restoration:No
    Beneficial Use:No
    Feasibility:No
    Coastal Location:South Shore of Long Island and Staten Island
    Related Navigation Projects:
     

  • Shinnecock Inlet
  • Long Island Intracoastal
  • Project Reliability

    The reliability was updated on: 11/8/2011 3:13:2



    Unconstructed

    Activities

    Date of Next Renourishment:data unavailable
    Date of Last Renourishment:data unavailable
    Desired Renourishment Cycle (yrs):data unavailable
    # of Nourishment Operations:data unavailable
    Is Erosion Partially Induced by Navigation?No
    Project Phase:Study
    Notes:

    Files & Links

    • Sorry, no files exist for this project.